20130503_092846.jpg

20130503_092846.jpg

New subtrates with Waterproofing

 

 

 

  • Remove shower screen and fittings

  • Remove damaged substrates and old tiles

  • Reinstall new substrate with FC sheeting for wall and CF sheeting for floor if required

  • Construct hob if required

  • 1st waterproof wall and floor

  • 2nd waterproof wall and floor 

 

Duration: 2-3 days